Archive for September, 2008

Living Column

September 23, 2008

Federico has built a column in the back garden that is formed with a series of disks. The disks are connected to each other in the center around a steel tube that is the load bearing part of the column. Between each disk there is a level of sand and earth. The sand is at the front of the column, and will be washed away by rainwater. The earth is at the back of the column and will stay in place and eventually we’ll have ferns and other plants growing and hanging down from the column making it a “Living” Column.

Click here to see a slideshow of the making of the column.

Advertisements

Primera clase de arte en el museo

September 22, 2008

 

Alumnos en el jardin del museo

Alumnos en el jardin del museo

 

 

 

Alumnos trabajando a sus proyectos de esculpturas

Alumnos trabajando a sus proyectos de esculpturas

 

Papas de los alumnos mirando la clase

Papas de los alumnos mirando la clase

 

Hermanito y hermanitas de los alumnos

Hermanito y hermanitas de los alumnos

El sabado hicimos una primera clase de arte en el museo para presentar el espacio a los alumnos con sus familiares; estuvo muy alegre.

Entrance Fountain

September 17, 2008
Fuente/fountain

Fuente/fountain

Federico finished the fountain at the entrance of the museum today. We wired the pump and he hid the pump under an artificial “rock” he had made.

The squarish thing in the background is a “pila” (a water container). Federico will be converting it into a colonial style fuente before the opening.

Aceite de linaza en el ultimo poste

September 7, 2008

Portique de la première galerie

September 2, 2008
pose des carreaux sol en terre cuite

pose des carreaux sol en terre cuite

Aujourd’hui les maçons commencent la pose des carreaux de sol du portique de la galerie no 1. La terre cuite (identique au carreaux origineaux) , qui remplace le sol en béton (fait dans les années 60), laissera sécher le sol et évitera les remontées d’ humidité dans les murs en pisé.